top of page

Get a Freen Estimate

Choose prices
Select Service
How did you hear about us?

Walk-In Shower Renovation 
in Ottawa

Modern, Spacious & Built for Comfort

Curbless & barrier-free options

Frameless glass, tile walls, LED accents

Local, licensed renovation team

Built to Ontario Code — start to finish

Build From 

 $9,000

Upgrade your bathroom with a walk-in shower that blends sleek design with easy access. Whether you’re looking for minimalist luxury or a safer solution for aging-in-place — BeLeaf delivers custom walk-in showers designed for real life in Ottawa.

  • Facebook
  • Instagram
  • Youtube
  • TikTok
  • X

Why Choose a Walk-In Shower?

A walk-in shower isn’t just a design trend — it’s a smart, functional upgrade for nearly any bathroom.

Here’s why more Ottawa homeowners are making the switch:

Black man smiling while showering, water flowing across his face, in a gray-tiled bathroom. The scene is joyful and refreshing.

01. More Space & Openness

 Without a bulky tub or curtain, the room feels bigger and more breathable — especially in smaller bathrooms.

Wet feet standing on tiled shower floor, water flowing toward drain. White wall tiles in the background add contrast.

02. Barrier-Free Access

 No step. No edge. Just easy entry for everyone — whether it’s for aging in place, limited mobility, or daily convenience.

Modern bathroom with grey marble walls, sleek black shower, towel rack, and glass shelves with bottles. Soft lighting creates a serene mood.

03. Sleek, Modern Look

 From glass panels to stone tile and matte black fixtures — walk-in showers instantly elevate the look of your home.

Woman in black uniform cleans a glass shower door with a cloth and spray bottle. She's wearing gloves and mask in a tiled bathroom.

04. Easier to Clean

Fewer corners, less grout, and no shower door tracks mean less scrubbing and more shine.

Man holding little girl in bathroom with walk-in shower, both in white robes. Girl smiles in round mirror reflection. Gray tiled walls with stone accent.

05. Future-Ready Design

Planning to stay in your home long-term? This upgrade adds both practicality and resale value.

Want to see more?

Resent Shower Conversion Services 

FROM BE LEAF RENOVATION

What’s Included
in Every BeLeaf Walk-In Shower Renovation?

When you choose Be Leaf, you’re not just getting a new shower — you’re getting a full-service experience designed to be efficient, clean, and stress-free.

Here’s what’s included in every walk-in shower project:

Demolition processes for barrier-free shower remodeling. Be Leaf Renovation worker kneels on floor, using a red Milwaukee power tool to drill tiles. Wearing a mask and cap in a dusty, renovation setting.

01. Demolition & Site Preparation

 We safely remove your old tub or shower enclosure and prepare the space for a clean installation.


 Dust control + debris disposal = minimal disruption to your home.

Plumber fixing pipes, hands close-up, with scattered tools on the floor during Ottawa bathroom contractor turnkey. Black and white image conveys focus and diligence.

02. Plumbing & Drainage Upgrades

 We relocate or upgrade your plumbing as needed — ensuring smooth drainage, hot water reliability, and code compliance.

Image of two parts. First is wall construction with frame and plumbing settings. Second: Be Leaf employee installs waterproof membrane on wall. Exposed wooden frames, tools, and packaging are visible. Text reads "PROVA-MAT" and "be leaf."

03. Waterproofing & Framing

 Using premium systems like Schluter or Wedi, we fully waterproof the shower zone before tile or fixtures are installed.


We also frame for built-in niches, benches, or custom glass if needed.

Tiler applies adhesive to a tile in a construction setting with partially tiled walls. They're wearing a cap and work gear.

04. Tile & Finishes Installation

 Your chosen tile is installed with expert craftsmanship and attention to slope, edge, and symmetry.


Whether it’s a matte black niche or a marble bench — we bring your design to life.

Laborer installing glass in a tiled bathroom during custom shower installation. He wears a cap and black shirt, focused on the task. A stool and tools are visible nearby.

05. Glass & Fixtures Mounting

 We install frameless glass, shower heads, thermostatic controls, grab bars — all precision-mounted and sealed.

During walk-in shower renovation service, employee applying sealant to shower glass in modern bathroom, focused expression. Brick-patterned tiles and overhead shower visible.

06. Final Touches & Clean-Up

Sealing, caulking, mirror mounting, touch-ups — plus a spotless clean to make your new walk-in shower move-in ready.

Two people converse in a bathroom with geometric tile design in shower enclosuer. Be Leaf Renovation company project manager wears "be leaf" hoodie with "You can Believe!" textand listens to client who explains something. Mood is friendly.

07. Project Management & Communication

One dedicated manager from start to finish.
Daily updates. Clear timelines. No surprises.

 

All backed by our workmanship warranty & local support — right here in Ottawa.

white-Decor.png

How Process Works: Walk-in Shower Installation 

Be Leaf Renovation Company's walk-in shower renovation/remodel process is designed to be quick and clean. It gives you a contemporary new space without the hassle.

Step 01

Consultation & Bathroom Review

Our project manager meets in your home to learn what is better for you and take a close look at your current bathroom. You’ll receive a tailored design plan, finish samples, some ideas, and a quote about your shower right away.

Step 02

Design Confirmation & Scheduling

Based on data, we finalize every detail with you, such as fixtures, layout, wall style, and others. Then we pick an installation date that is convenient for you. 

Step 03

Careful Demolition & Preparation

Your old fixtures and walls are removed with care. Then we handle all debris. Next, we prep the plumbing, subfloor, and walls for your brand-new walk-in shower.

Step 04

Base &
Surround Installation

We set your waterproof shower base and install the wall surround. It is up to you—tile or acrylic. We make sure that every joint is sealed with precision for lasting performance.

Step 05

Fixtures, Glass
& Details

Be Leaf's workers will complete the installation with all the finishing touches, including trims, caulking, and a full cleanup. We will install faucets, safety bars, shelving, glass doors, and others.

Step 06

Walkthrough & Warranty Coverage

We conduct a comprehensive evaluation of the project with you, address any inquiries, and ensure that you are satisfied with your new shower. You’ll have peace of mind with our 3-year workmanship warranty.

Process Photo Gallery:
How We Replace a Tub with a Shower in Ottawa

How Much Does a Walk-In Shower Renovation Cost in Ottawa?

Walk-in shower renovations can vary depending on size, materials, and features — but here’s what most Ottawa homeowners can expect:

Standard

Remodel

$8,000

Finish materials (vanity, sink, faucet, toilet, tile, etc.) ARE NOT INCLUDED

Our labor + our rough materials

$8,000 – $12,000

  • Shower base & acrylic or ceramic tile

  • New plumbing fixtures

  • Basic glass panel or curtain

  • Waterproofing & install

Perfect for replacing a tub with a simple tiled walk-in shower.

Custom

Upgrade

 $13,000

ALL INCLUDED

Our labor and rough materials + our finished materials + our design advising

$13,000 – $20,000

  • Large-format tile or stone

  • Custom niches, bench, and LED accents

  • Frameless glass enclosure

  • Premium fixtures (rain shower, wand, thermostatic valve)

  • Smart drainage & Schluter waterproofing

  • Grab bars or barrier-free entry (optional)

 For homeowners wanting a truly modern, spa-like shower experience.

No guesswork. No vague ranges.

 We provide a detailed, fixed-price quote before any work begins.

Walk-In Shower Design Options:
 Designed for Your Space, Your Style

No two bathrooms — or homeowners — are alike. That’s why every walk-in shower we build is customized around how you live. Let’s explore what’s possible:

four-part image showing large-format matte tiles, ceramic tiles, stone tiles, glass options.

Tile & Wall Finishes

 From timeless subway tile to natural stone slabs — your walls set the tone for the whole space. 

Popular Options:

  • Marble-look porcelain

  • Large-format matte tiles

  • Mosaic or accent borders

Illustration of for images Frameless Glass, Framed Glass, Sliding  Doors, Barrier-Free Entry

Glass or Open Concept

 Frameless glass for a clean look — or fully open European-style for barrier-free access.

You choose:

  • Fixed glass panel

  • Glass door

  • No door at all

Collage of four bathroom design lighting and fixtures. Shower niche surrounded by geometric tiles; sleek niche with lighting straps; corner bench, and wide niche.

Built-In Bench & Niche

Add a touch of luxury (and practicality) with a custom tiled bench and recessed storage.

  • Corner Bench (Triangular)

  • Full-Length Bench (Along the Wall)

  • Fold-Down / Flip-Up Bench

 

  • Standard Rectangle Niche

  • Double/Stacked Niche

  • Wide Niche (Across the Wall)

  • Framed or Accented Niche

Picture of four parts. Showerhead with running water; terrazzo bathroom wall with wall-mounted LED lights; modern light fixture; hand holding grab bar in a sleek, neutral-toned setting.

Lighting & Fixtures

Go beyond basic chrome — explore matte black, brushed gold, or warm LED accents.

Popular upgrades:

  • Rainfall or dual shower heads

  • Wall-mounted LED lights

  • Steam shower or aromatherapy options

  • Grab bars

Want a closer look at your 3D design choices?

Need help deciding what suits your space and lifestyle?

We can bring your ideas to life with a 3D visualization, giving you a clear view before your walk-in shower renovation or remodeling starts.efore work begins.

Our Latestt
3D Rendering Example

Step Into a Shower That’s Built for Comfort — and Built to Last

No more cramped tubs. No more slippery steps.It’s time to upgrade to a walk-in shower that’s safer, sleeker, and fully customized to your lifestyle.

Why Ottawa Homeowners Trust
Be Leaf Renovation

We’ve helped hundreds of Ottawa homeowners transform their outdated bathrooms into modern, functional spaces — including custom walk-in showers that truly impress.

Here’s why so many people recommend BeLeaf:

We’re Local —
And Proud of It

 From Westboro to Orleans, we understand Ottawa homes inside and out. Our team knows the local building codes, materials that perform in our climate, and how to design for both style and function.

Licensed, Insured &
Code-Compliant

Every plumber, electrician, and installer on our team is certified and fully insured. We build every shower to meet — or exceed — Ontario’s safety and construction standards.

 No Guesswork.
No Pressure.

 We believe in transparency. That means no vague quotes, no hidden fees, and no sales tactics. Just honest advice and clear, upfront pricing.

End-to-End
Project Management

You won’t be chasing 5 different trades. You’ll have one point of contact, daily updates, and full support from start to finish.

3 YEARS

Warranty
Included

 We stand behind our work. Every project includes a workmanship warranty — because your peace of mind matters just as much as the tile on the wall.

Crafted with Care

From high-quality materials to expert installation, every detail is handled with precision and dedication so you can enjoy your renovated space for years to come.

bottom of page